![]() |
INTEX-B will be conducted during a 10-week period from March 1 to May 15, 2006. The first phase of the study will be performed during March and will focus on Mexico City pollution outflow, while the second phase will be performed during April and May and will focus on Asian pollution outflow. The INTEX-B mission is sponsored by the Tropospheric Chemistry Program at NASA Headquarters. The TCP Program Manager is Dr. Bruce Doddridge. |
Milagro - 2006 Support Pages at JOSS
Travel Information, Information Report on Health and Security in Mexico, WRF model Forecast Site for MILAGRO (NCAR / MMM), and more...
MCMA-2006 Campaign
Ground-Based Urban Measurements in Support of Milagro Airborne Measurement Campaign
MAX-MEX: Megacity Aerosol eXperiment - MEXico City, March 2006
DOE atmospheric science program Mexico City 2006 field campaign; overview, objectives, and planned coordination with other projects.
NASA LaRC Satellite Overpass Predictor
*All of the following documents open in a new window
Jetstream 31 (J31) at Mid-Campaign in INTEX-B/MILAGRO: Science Goals, Payload, Example Results, Assessment (9 MB, PDF)
MILAGRO J-31 Mission Schedule as of January 27, 2006 (84 KB, PDF)
Install Update 01/25/05 (21 KB, PDF, opens in a new window)
Jetstream 31/ CAR Integration Status 1/25/06 (21 KB, PDF)
Jetstream 31/ CAR Integration Status 1/23/06 (466 KB, PDF)
Jetstream 31/ CAR Integration Status 1/18/06 (704 KB, PDF)
Jetstream 31/ CAR Integration Status 12/21/05 (480 KB, PDF)
Jetstream 31/ CAR Integration Status 12/07/05 (1.03 MB, PDF)
Jetstream 31/ CAR Integration Status 11/30/05 (1.06 MB, PDF)
Jetstream 31/ CAR Integration Status 01/04/05 (98 KB, PDF)
Site navigation: Home | Instrument | Application | News | Data | Software | Reference | Staff | Photo Album